Home Company Capability References Investors News Careers Contact
Design & Engineering
Manufacturing
Tower Testing and R&D centre
Turnkey Solutions
Our Tower testing and R&D station with its sophisticated state of art equipments rank it amongst largest and best of its kind across the world.
 
 
Kalpataru has set up its own Tower Testing Station and R & D Centre in October 1998 at Punadra close to Gandhinagar. Over 100 tower tests have already been carried out since then for various clients including Power Grid Corporation of India and ABB. In the year 2000, the company tested a 500 KV Double circuit tower with quadruple conductor for NPC, Philippines and Sumitomo, Japan weighing 53.3 MTs with height of 79.2 mts, undoubtably one of the tallest and heaviest towers ever tested.

This Tower Testing Centre can test up to 800 KV double circuit towers with a base width of 27 mts x 27 mts (both square or rectangle) and a maximum height of 85 mts. Along with the sophisticated state-of-the-art equipment, today it ranks amongst one of the largest and best of its kind in India and across the world.

Operations

Transmission line towers are highly indeterminent structures and in the design of towers a number of assumptions are made. The purpose of test is to ensure that the assumptions are rightly made and the tower will meet the desired performance criteria.

For this purpose the tower is erected on the test bed and the load at various points of tower is applied by winches driven by electrically operated motors through wire ropes and pulley blocks. There are 41 Winches all of 3 MTs capacity, 28 housed in Transverse Mast Winch House and 13 in Longitudinal Mast Winch House. Strain gauge type Load cells are mounted near the load application point of test tower so as to make them strained by loads applied.

The operation of winches is centrally controlled from control cabin through inverter and digital indicators. Computer aided rigging scheme is used to ensure accurate application of load at all stages of loading. The test is closely monitored from the control cabin, which has sophisticated electronic instruments for application, monitoring and recording of loads. Testing can be done in three modes viz. Manual, Semi auto and Auto mode. In addition set points can be defined directly on the indicator or can be set through computer. Print out of test results and tower Test data or peak load for destructive test can be obtained.

The System Software is window based. This consists of 41 Winches DCS, (Distributed Control System with Servo Drive Motor), Remote Starter, Line drivers and SCADA PC. The tower tester have the facility to configuring the winches load, which selection option, group selection, set point entry in %, cross checking the load limits, remove starting and monitoring the load activity, etc.

Sailent Features

Testing Capacity Upto 800 KV Double circuit tower
Tower Base Width 27.0 mts x 27.0 mts maximum
Base Configuration Any of square or rectangle
Maximum Height of Test Tower 85 mts
Maximum Cross Arm Spread 40 mts
Maximum Uplift per Leg 500 MTs
Maximum Compression per Leg 625 MTs
Safe Over Turning Moment 27,000 MTs - mts.
Height of Transverse Mast 85 mts
Height of Longitudinal Mast 70 mts
Height of Erection Mast 75 mts
Defection Measurement Optical (Theodolite)
Load Measurement Strain gauge type load cell
Calibration of Load Cell Through 60 MT Universal Testing Machine
Instrumentation Sophisticated remote control electronic equipment for application and measurement
of load.

Capacities
Limiting loads that can be applied through each loading point without special arrangements.

  Conductor Earth Wire Number
Transverse 60 MTs 15 MTs 16
Longitudinal 50 MTs 12 MTs 16
Vertical 30 MTs 06 MTs 14

Special Features

  Digital load cell indicators.
  Testing can be done in three modes viz. Manual, Semi Auto and Auto mode.
  Resolution of digital indicators or can be set through the computer.
  Print out of the Test results and Test date of peak load on Destructive Test can be obtained.
  Inverters or AC variable drive has been used so that variable loading speeds can be obtained without using additional motors for winches.

Main Equipment
  Electric Winch 3 MTs capacity - 41 Nos.
  Load cell - capacity 5 MTs to 40 MTs - 42 Nos.
  Universal Testing Machine (UTM) capacity 60 MTs - 1 No.
  Digital Indicators - 41 Nos.

Towers have been tested for the following clients:
POWERLINKS, AUSTRALIA
PT PLN, INDONESIA
SUMITOMO, JAPAN
POWER GRID, BANGLADESH
EGAT, THAILAND
ADWEA, UAE
NPC, PHILIPPINES
EEPCO, ETHIOPIA
EVN, VIETNAM SONELGAZ, ALGERIA
FEWA, UAE  

and the list continues………

  Back to Top