Home Company Capability References Investors News Careers Contact
Corporate Profile
Infrastructure
Management Team
Awards & Recognition
Milestones
Biomass Power Division
Pipelines Division
Distribution Projects Division
Special Projects
Group Companies
 
 

The company has entered into EPC Contracting of Cross Country Gas & Oil Pipelines since 2004.

The Oil & Gas sector has opened up for reforms in India. As a result, the demand of energy per capita is rising steadily. Simultaneously, growing demand of natural gas and petroleum products worldover has resulted in more and more pipelines being set up.

Like elsewhere in the world, natural gas has emerged as the dominant source of additional energy in India. There exists a huge deficit of natural gas based on current production and demand data. While additional gas quantities, almost equal to exisitng gas production in the country, are going to be made available through LNG and new gas finds, the infrastructure to transport this gas to demand centers is required to be built afresh. It is projected that an estimated 8,000 kms of big-inch gas pipelines will be set up in next 5 years in India.

The pipeline network available in India today is highly inadequate to transport the petroleum products to demand centers in an efficient, safe and environment friendly way. To meet the growing demand and in view of the awareness of people towards environment, it is projected that over 4,000 kms of product and crude oil pipelines will be built in next 5 years.

Kalpataru has set up a full fledged organization to take forward our Pipeline Division, led by a group of highly experienced and competent persons, who are well-known in the pipeline industry in India. More & more internationally experienced & qualified professionals are joining the division regularly making it a formidable contender in the industry.

Along with a well experience team, the company has made large investments in specialized pipeline equipments to sieze the opportunity available in the EPC contracting of Oil & Gas pipelines for clients such as GAIL, IOCL, HPCL, BPCL, GSPC, Reliance etc in India and for PDO, OGC, ADNOC, DEPA, ARAMCO & Petronas etc. internationally.

As a strategy, we have set up a Welders’ training center at Gandhinagar, where we bring qualified young welders and train them up for cross-country operations and down-hill welding. They form a reserve pool for us to draw from for our various projects. These welders are trained for zero defect welding. We have on our rolls a large number of other skilled personnel from other pipeline disciplines, who are also regularly trained and kept in reserve.

BREAKTHROUGH ACHIEVEMENTS

In 2006 we completed our first contract for the construction of 16” dia x 386 Kms and 8” dia x 56 Kms product Pipeline from Laban (near Kota) to Bijwasan (Delhi) for Bharat Petroleum Corporation Ltd. (BPCL) worth Rs. 830 Million (USD 20 Mn). The contract was secured by the company’s International Pipeline partner, who bid for the Project with our support and was executed on EPC basis by Kalpataru as back to back contractor.

We have also completed a 18" x 110 kms gas pipeline from Vijaipur to Kota from GAIL in Feb, 2007, followed by a prestigious Rs 1.8 Bn (USD 43 Mn) project from Panvel to Dabhol (Part B) of 30" x 74 kms from GAIL which has been successfully completed by July, 2007. Both these projects were executed on EPC basis in consortium with our International partner.

Kalpataru is at an advanced stage of completion for an EPC contract of 427 kms, 24" crude oil pipeline in Madhya Pradesh for the Vadinar-Bina Pipeline Project of Bharat Oman Refinery Ltd. having estimated contract value of Rs.1.40 Billion (USD 35 Mn). This project is scheduled for completion by Oct, 2008.

The company has almost completed another contract of Rs. 270 Mn (USD 6.5 Mn) from Reliance for its 28" Spur gas pipeline.

The company has created a large pool of specialised pipeline equipment consisting of Pipe layers,  multiple Boring Machines, Bending Machines, Dozers D8/D7/D6, Excavators, Welding Machines, etc.

Cheers to our Pipeliners for having completed over 1,000 kms of challenging pipeline jobs in less than 3 years of operations.

Career Openings for
Pipelines Division
 
Click here for details of Projects executed

 

  Back to Top