Kalpataru
Power Transmission Limited
is one of the leading companies in the field of Turnkey
projects for EHV Transmission Lines up to and including
800 KV in India and Overseas. As an EPC contractor, our
scope of work includes design, testing, fabrication, galvanizing
of towers and construction activities from survey, civil
works/ foundation, erection to stringing and commissioning
of EHV lines, besides procurement of items such as conductors,
insulators, hardware accessories etc. We also participates
in Substation projects on a partnership basis.
We
also provide EPC services for Distribution
Projects of 11/33 kv and also construct cross country
Pipelines, besides
Telecom Towers.
Located at Gandhinagar Gujarat, in Western India, Kalpataru
Power Transmission is a public listed company with a
turnover of USD 385 Million (Rs. 19.1 Billion) and annual
production of 80,000 MTs till 2007-08. The company has
a net worth of over USD 200 Million and
an order booking of over Rs 50 Billion (USD 1 Billion).
The company has also attained distinction of crossing the
USD 800 Million (Rs. 40 Billion) market
capitalization. On a combined basis (with JMC Projects),
the consolidated turnover has crossed Rs 32.8 Billion
(USD 655 Million).
It is a part of the diversified Kalpataru Group which has
a presence in Real Estate / Property Development, Civil
Contracting, International Trading and Consumer Goods &
Services. The Kalpataru group holds over 63% of the equity.
Kalpataru Power has two large Fabrication Plants with an
annual installed capacity of 108,000 MTs (with a capacity
addition of 24,000 MTs in Oct, 2008) one of the largest
in the world and is equipped with modern machineries (including
16 CNC machines) and automated temperature controlled Galvanising
Baths, besides its own state-of-the-art Testing Station
and R & D Centre. It was the first company in 1994 in the
Indian transmission industry to be ISO
9001 certified.
About 650,000+ MTs of towers and substation structures have
already been designed, manufactured and supplied over the
last few years of which over 175,000 MTs has been exported.
Over 250 Tower Tests of 132-500KV have been carried out
successfully, including 125 nos. at our own Testing Station,
which is one of the largest facilities of its kind in the
world.
Besides workmen at the plant & construction sites, the Company
employs over 1,400 Managers and Staff. Also, a full-fledged
Design / Engineering Department with over 35 qualified design
engineers using PLS Tower, i-tower, STADD, PLSCADD, BOCAD,
AUTOCAD facilties.
Our Construction division has completed over 8,000+ kms
of turnkey projects in India for various clients such as
the Power Grid Corporation of India and various State Electricity
Boards (SEBs) of Gujarat, Karnataka, Maharashtra, Rajasthan,
Andhra Pradesh, Rajasthan, Orissa, Tamil Nadu and Madhya
Pradesh.
With a strong thrust on Overseas
markets, the Company is/has already exported Towers or is
executing/has completed Turnkey projects in :
Asia
| Philippines
|
| Malaysia |
| Vietnam |
| Indonesia |
| Thailand |
| Bangladesh |
Nepal |
|
Middle East
Kuwait |
UAE |
Qatar |
| Syria
|
| Turkey |
Iraq |
|
Africa
| Algeria
|
| Ethopia |
| Zambia |
Nigeria |
Kenya |
Tanzania |
Mozambique |
Djibouti |
Uganda |
South
Africa |
|
|
|
|
Also the Company has worked closely with reputed International
EPC contractors like
| >
ABB SAE (Italy) |
>
Downer (Australia) |
| >
Alstom / Cegelec (France) |
>
Enel Power (Italy) |
| >
Cobra (Spain) |
>
Sumitomo Electric (Japan) |
| >
ETA (UAE) |
>
Siemens |
Major part of the business is either from physical exports
or deemed exports (i.e domestic projects funded by multilateral
funding agencies like World Bank, Asian Development Bank,
JBIC/OECF, Arab Fund etc). The company is also keen to participate
in Infrastructure projects under BOT/ BOOM or deferred credit
financing basis.
Transmission
Line Experience
| Total
supplies |
Over
6,00,000 MTs |
| Total
physical exports |
Over
2,00,000 MTs |
| Tested |
Over
250 Towers (including over 125 at own Testing
Station) |
|
Construction of lines
|
Total lines from 130kv to 765KV HVDC |
over
8,000 kms |
|
Our
evolution as a leading Infrastructure Player
Kalpataru
Power is adapting its strategy and business profile to emerge
as a Infrastructure player in the country. Some
of the major initiatives taken by the company include :
Distribution
Projects: The company has ventured into 11/33
kv lines & substation projects to benefit from the thrust
given to Rural Electrification / APDRP programs of the Ministry
of Power/Distribution Utilities. It has already secured
several projects in North India.
Oil
& Gas Pipelines: A specialised team and
Capex investment in Pipeline equipments has been done to
execute several cross-country pipeline projects for BPCL,
GAIL etc.
Civil
Contracting: Our acquisition of a controlling stake
(51%+) in the Rs 9 Billion USD 180 Mn JMC
Projects, since Feb, 2005 gives us a strong presence in
Factories, Industrial Structures, Buildings, Software Parks
and Roads & Bridges. It has also entered into Water
Pipelines / Sewerage, Railways & Civil work for Power
Projects. The order backlog is approx. Rs. 20 Billion
(USD 400 Million). After Kalpataru's association,
JMC has become one of the fastest growing small cap companies
in the Construction / Civil Engg. sector. Please visit us
at www.jmcprojects.com
Click
here to download a small Presentation on Projects of JMC.
|